Residential Building Saler Homes / NAC Arquitectos

This project is located on Antonio Ferrandis Street and is part of the P.P. Quatre Carreres. The location is especially privileged because it is located on the southern edge of the city, separating two radically opposite plots and scales, admiring the large expanse of an orchard that extends to the Albufera Natural Park and with visual continuity to the sea.

Villa Grimseiddalen / Saunders Architecture

There is a thoughtful degree of flexibility woven into the design of Todd Saunders’ houses. Importantly, his buildings allow for the possibility of change and adaptation as the needs of his clients gradually shift and alter over time. The concept of ‘future proofing’ is particularly important for clients building a family home for the long term. Like many of the families that commission Saunders, the owners of Villa Grimseiddalen, near Bergen, came to him with a commission for a dream home that would fulfill all of their ambitions for the present but also carry them into the future.

Chambésy Station Square and Cottage Renovation / acau architecture sa

The rehabilitation of Chambésy station square defines new access to the old village, as part of a wider renovation project of the railways undertaken by the Swiss Federal Railways (CFF). The intervention aims to restore a space that for fifteen years served as a parking lot and for CFF facilities. The reappropriation of this neglected space is part of the political strategy of promoting soft mobility and encourages residents to use the train. On the edge of the new train station square, the project integrates the renovation of an old cottage building, which becomes part of a spatial sequence connecting the train stop to the historic village.

Reinoldi Comprehensive School / SSP SchürmannSpannel

The change in school pedagogy and the reinterpretation of teaching forms prompted the city of Dortmund to examine the location and the main building of the Reinoldi - Gesamtschule, which had been expanded in several sections but was getting on in years, for its future viability. The analysis recommended a new building and the demolition of the existing building.

Subscribe To Our Newsletter

Follow Us On