From Drainage to Waterproofing: How to Shape the Design and Performance of Shower Systems

In contemporary bathroom architecture, the drain has evolved from a purely functional component into a design element that guides layout, accessibility, and long-term performance. When drainage, slope geometry, and waterproofing are designed as one system, the tiled surface achieves both visual refinement and reliable function—qualities that are critical for hotels, spas, and residences. Schluter® establishes the essential drain-to-waterproofing connection in a controlled factory setting, rather than relying on field assembly.

BIG Wins International Competition to Design the New Hamburg State Opera on HafenCity’s Waterfront

BIG – Bjarke Ingels Group has been selected as the winner of the international competition to design the new Hamburg State Opera, a major cultural project planned for the Baakenhöft peninsula in HafenCity, Hamburg, Germany. The building will consolidate the city's opera and ballet companies under one roof, introducing new performance spaces, production facilities, and public amenities along the Elbe. The project replaces the mid-20th-century opera house on Dammtorstraße, responding to the city's call for a venue that reflects contemporary standards in acoustics, stagecraft, and audience experience.

Hotel + Social Community Center / MEII ESTUDIO

The void left in the heart of a neighborhood when a school closes is difficult to fill. This was the case with this 1970s school, built according to the same standards as many others of its time in southeastern Spain. When the educational program was relocated, the life and activity once linked to the school disappeared, leaving behind an empty building at the center of the neighborhood.

Dallas Evaluates Repair and Demolition Options for I.M. Pei’s Modernist City Hall

Since August 2025, debate has intensified in Dallas, United States, over the future of one of its modern landmarks: I.M. Pei & Partners' Dallas City Hall. This month, the Dallas City Council will continue weighing whether to repair, sell, or demolish the 47-year-old building, following growing concerns over long-deferred maintenance and the need for major investment. In late October, council members began public listening sessions and committee meetings to gather resident input. Preservationists and some council members urged a full study of repair options and historic landmarking, while others emphasized fiscal and operational concerns.

Subscribe To Our Newsletter

Follow Us On